## Equipment service report

CLIENT

Braithe Estuary Partnership Estuary House, Vardenne Quay

Braithe BR3 4LN

| Job reference    | KAL-ESR-4471                   |
|------------------|--------------------------------|
| Date of visit    | 29 January 2026                |
| Engineer         | R. Tarbert                     |
| Instrument       | Kestrel 400 turbidity analyser |
| Location         | Vardenne Quay pumping station  |
| Service interval | Twelve months                  |

## Reported fault

Intermittent baseline noise on channel 2, reported by the Partnership on 21 January. The analyser had been running without attention since the annual service in January 2025.

## Work carried out

The flow cell was removed, stripped and cleaned, and the pump tubing set replaced. The optical window was found to be lightly fouled on the inner face; it was cleaned rather than replaced, and should be inspected again at the next visit. The analyser was recalibrated against the two-point standards and left running on channel 2 for an hour before the site was handed back. The completed worksheet is bound in as page 2 of this report.

## Kirkhollow Analytical Laboratories Ltd Service worksheet

Job reference

Instrument serial

Engineer

Date KAL-ESR-4471

GK-2214-77

R. Tarbert

29·January 2026

## CHECKS AND READINGS

Flow cell condition on arrival

Flow cell pressure after service

Zero drift over 30 minutes

Span recovery against standard

Lamp hours at service

Result Fouled, inner face

2.4 bar

0.003 mg/l

99.4 per cent

8,140

Pass

## Calibration certificate SR-4471/2

Analyser left in service on channel 2. Optical window to be inspected at the next visit.

TIME ON SITE

Arrived

Left

Chargeable time

Next service due

29 January 2026, 09:15

29 January 2026, 13:40

4 hours 25 minutes

January 2027

## RECEIVED BY

Name

Position

Date M. Cairney Duty operator, Vardenne Quay

29 January 2026

<!-- image -->

Engineer's signature FIELD SERVICE

## Parts fitted

| Part                    | Code    |   Quantity |
|-------------------------|---------|------------|
| Pump tubing set         | PT-114  |          1 |
| Flow cell O-ring, 12 mm | OR-0912 |          2 |
| Inlet filter, 40 micron | IF-4004 |          1 |

## Declaration

The work described in this report was carried out to the standard set out in the service agreement. The analyser was left in service and calibrated. The next annual service falls due in January 2027.

| Engineer      | R. Tarbert       |
|---------------|------------------|
| Countersigned | Dr A. J. Prosser |
| Report issued | 2 February 2026  |