{
  "job": {
    "user_metadata": null,
    "id": "pjb-9iswca49c5u6ho8v8t9693wv38dw",
    "created_at": "2026-09-10T13:26:52.047078Z",
    "updated_at": "2026-09-10T13:27:10.581806Z",
    "project_id": "f2cfef38-e7e3-4955-be62-16148c6f1b96",
    "status": "COMPLETED",
    "error_message": null,
    "name": "service_report_KAL-ESR-4471.pdf",
    "tier": "agentic",
    "usage": {
      "credits": 30.0
    }
  },
  "result_content_metadata": null,
  "text": null,
  "markdown": {
    "pages": [
      {
        "page_number": 1,
        "markdown": "# Equipment service report\n\nCLIENT\n\nBraithe Estuary Partnership\nEstuary House, Vardenne Quay\nBraithe BR3 4LN\n\n<table>\n    <tr>\n        <td>Job reference</td>\n        <td><strong>KAL-ESR-4471</strong></td>\n    </tr>\n    <tr>\n        <td>Date of visit</td>\n        <td><strong>29 January 2026</strong></td>\n    </tr>\n    <tr>\n        <td>Engineer</td>\n        <td><strong>R. Tarbert</strong></td>\n    </tr>\n    <tr>\n        <td>Instrument</td>\n        <td><strong>Kestrel 400 turbidity analyser</strong></td>\n    </tr>\n    <tr>\n        <td>Location</td>\n        <td><strong>Vardenne Quay pumping station</strong></td>\n    </tr>\n    <tr>\n        <td>Service interval</td>\n        <td><strong>Twelve months</strong></td>\n    </tr>\n</table>\n\n### Reported fault\n\nIntermittent baseline noise on channel 2, reported by the Partnership on 21 January. The analyser had been running without attention since the annual service in January 2025.\n\n### Work carried out\n\nThe flow cell was removed, stripped and cleaned, and the pump tubing set replaced. The optical window was found to be lightly fouled on the inner face; it was cleaned rather than replaced, and should be inspected again at the next visit. The analyser was recalibrated against the two-point standards and left running on channel 2 for an hour before the site was handed back. The completed worksheet is bound in as page 2 of this report.",
        "header": "Kirkhollow Analytical Laboratories Ltd Job KAL-ESR-4471",
        "footer": "KAL-ESR-4471 Page 1 of 3",
        "success": true
      },
      {
        "page_number": 2,
        "markdown": "## Kirkhollow Analytical Laboratories Ltd FIELD SERVICE\n\n## Service worksheet\n\n**Job reference**: KAL-ESR-4471\n\n**Instrument serial**: GK-2214-77\n\n**Engineer**: **R. Tarbert**\n\n**Date**: **29 January 2026**\n\n### CHECKS AND READINGS\n\n**Flow cell condition on arrival**: **Fouled, inner face**\n\n**Flow cell pressure after service**: **2.4 bar**\n\n**Zero drift over 30 minutes**: **0.003 mg/l**\n\n**Span recovery against standard**: **99.4 per cent**\n\n**Lamp hours at service**: **8,140**\n\n**Result**: **Pass**\n\n### Calibration certificate SR-4471/2\n\nAnalyser left in service on channel 2. Optical window to be inspected at the next visit.\n\n### TIME ON SITE\n\n**Arrived**: **29 January 2026, 09:15**\n\n**Left**: **29 January 2026, 13:40**\n\n**Chargeable time**: **4 hours 25 minutes**\n\n**Next service due**: **January 2027**\n\n### RECEIVED BY\n\n**Name**: **M. Cairney**\n\n**Position**: **Duty operator, Vardenne Quay**\n\n**Date**: **29 January 2026**\n\n[signature: R. Tarbert]\n\nEngineer's signature",
        "footer": "Service worksheet \u00b7 KAL-ESR-4471 Page 2 of 3",
        "success": true
      },
      {
        "page_number": 3,
        "markdown": "## Parts fitted\n\n<table>\n  <thead>\n    <tr>\n        <th>Part</th>\n        <th>Code</th>\n        <th>Quantity</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n        <td>Pump tubing set</td>\n        <td>PT-114</td>\n        <td>1</td>\n    </tr>\n    <tr>\n        <td>Flow cell O-ring, 12 mm</td>\n        <td>OR-0912</td>\n        <td>2</td>\n    </tr>\n    <tr>\n        <td>Inlet filter, 40 micron</td>\n        <td>IF-4004</td>\n        <td>1</td>\n    </tr>\n  </tbody>\n</table>\n\n## Declaration\n\nThe work described in this report was carried out to the standard set out in the service agreement. The analyser was left in service and calibrated. The next annual service falls due in January 2027.\n\n<table>\n    <tr>\n        <td>Engineer</td>\n        <td><strong>R. Tarbert</strong></td>\n    </tr>\n    <tr>\n        <td>Countersigned</td>\n        <td><strong>Dr A. J. Prosser</strong></td>\n    </tr>\n    <tr>\n        <td>Report issued</td>\n        <td><strong>2 February 2026</strong></td>\n    </tr>\n</table>",
        "header": "Kirkhollow Analytical Laboratories Ltd Job KAL-ESR-4471",
        "footer": "KAL-ESR-4471 Page 3 of 3",
        "success": true
      }
    ]
  },
  "items": null,
  "metadata": {
    "pages": [
      {
        "page_number": 1,
        "confidence": 0.988,
        "original_orientation_angle": 0,
        "cost_optimized": false,
        "triggered_auto_mode": false
      },
      {
        "page_number": 2,
        "confidence": 0.978,
        "original_orientation_angle": 0,
        "cost_optimized": false,
        "triggered_auto_mode": false
      },
      {
        "page_number": 3,
        "confidence": 0.978,
        "original_orientation_angle": 0,
        "cost_optimized": false,
        "triggered_auto_mode": false
      }
    ],
    "document": {}
  },
  "forms": null,
  "markdown_full": "\n\nKirkhollow Analytical Laboratories Ltd Job KAL-ESR-4471\n\n# Equipment service report\n\nCLIENT\n\nBraithe Estuary Partnership\nEstuary House, Vardenne Quay\nBraithe BR3 4LN\n\n<table>\n    <tr>\n        <td>Job reference</td>\n<td><strong>KAL-ESR-4471</strong></td>\n    </tr>\n<tr>\n        <td>Date of visit</td>\n<td><strong>29 January 2026</strong></td>\n    </tr>\n<tr>\n        <td>Engineer</td>\n<td><strong>R. Tarbert</strong></td>\n    </tr>\n<tr>\n        <td>Instrument</td>\n<td><strong>Kestrel 400 turbidity analyser</strong></td>\n    </tr>\n<tr>\n        <td>Location</td>\n<td><strong>Vardenne Quay pumping station</strong></td>\n    </tr>\n<tr>\n        <td>Service interval</td>\n<td><strong>Twelve months</strong></td>\n    </tr>\n</table>\n\n### Reported fault\n\nIntermittent baseline noise on channel 2, reported by the Partnership on 21 January. The analyser had been running without attention since the annual service in January 2025.\n\n### Work carried out\n\nThe flow cell was removed, stripped and cleaned, and the pump tubing set replaced. The optical window was found to be lightly fouled on the inner face; it was cleaned rather than replaced, and should be inspected again at the next visit. The analyser was recalibrated against the two-point standards and left running on channel 2 for an hour before the site was handed back. The completed worksheet is bound in as page 2 of this report.\n\nKAL-ESR-4471 Page 1 of 3\n\n\n---\n\n## Kirkhollow Analytical Laboratories Ltd FIELD SERVICE\n\n## Service worksheet\n\n**Job reference**: KAL-ESR-4471\n\n**Instrument serial**: GK-2214-77\n\n**Engineer**: **R. Tarbert**\n\n**Date**: **29 January 2026**\n\n### CHECKS AND READINGS\n\n**Flow cell condition on arrival**: **Fouled, inner face**\n\n**Flow cell pressure after service**: **2.4 bar**\n\n**Zero drift over 30 minutes**: **0.003 mg/l**\n\n**Span recovery against standard**: **99.4 per cent**\n\n**Lamp hours at service**: **8,140**\n\n**Result**: **Pass**\n\n### Calibration certificate SR-4471/2\n\nAnalyser left in service on channel 2. Optical window to be inspected at the next visit.\n\n### TIME ON SITE\n\n**Arrived**: **29 January 2026, 09:15**\n\n**Left**: **29 January 2026, 13:40**\n\n**Chargeable time**: **4 hours 25 minutes**\n\n**Next service due**: **January 2027**\n\n### RECEIVED BY\n\n**Name**: **M. Cairney**\n\n**Position**: **Duty operator, Vardenne Quay**\n\n**Date**: **29 January 2026**\n\n[signature: R. Tarbert]\n\nEngineer's signature\n\nService worksheet \u00b7 KAL-ESR-4471 Page 2 of 3\n\n\n---\n\n\n\nKirkhollow Analytical Laboratories Ltd Job KAL-ESR-4471\n\n## Parts fitted\n\n<table>\n  <thead>\n    <tr>\n        <th>Part</th>\n        <th>Code</th>\n        <th>Quantity</th>\n    </tr>\n  </thead>\n  <tbody>\n    <tr>\n        <td>Pump tubing set</td>\n<td>PT-114</td>\n<td>1</td>\n    </tr>\n<tr>\n        <td>Flow cell O-ring, 12 mm</td>\n<td>OR-0912</td>\n<td>2</td>\n    </tr>\n<tr>\n        <td>Inlet filter, 40 micron</td>\n<td>IF-4004</td>\n<td>1</td>\n    </tr>\n  </tbody>\n</table>\n\n## Declaration\n\nThe work described in this report was carried out to the standard set out in the service agreement. The analyser was left in service and calibrated. The next annual service falls due in January 2027.\n\n<table>\n    <tr>\n        <td>Engineer</td>\n<td><strong>R. Tarbert</strong></td>\n    </tr>\n<tr>\n        <td>Countersigned</td>\n<td><strong>Dr A. J. Prosser</strong></td>\n    </tr>\n<tr>\n        <td>Report issued</td>\n<td><strong>2 February 2026</strong></td>\n    </tr>\n</table>\n\nKAL-ESR-4471 Page 3 of 3\n",
  "text_full": null,
  "images_content_metadata": {
    "total_count": 0,
    "images": []
  },
  "job_metadata": {
    "state_transitions": {
      "pending_at": "2026-09-10T13:26:52.042474Z",
      "throttled_at": "2026-09-10T13:26:52.217032Z",
      "running_at": "2026-09-10T13:26:52.343852Z",
      "completed_at": "2026-09-10T13:27:10.583271Z",
      "failed_at": null,
      "cancelled_at": null
    },
    "quarantine": null,
    "pdf-pages": 3,
    "pdf-real-pages": 3,
    "pdf-rawTextLength": 3777,
    "pdf-mdLength": 3446,
    "pdf-time": 8420,
    "pdf-ocrTime": 0,
    "pdf-image-convertTime": 0,
    "pdf-pdfToHTMLTime": 0,
    "pdf-llmTime": 7194,
    "pdf-inputTokens": 55306,
    "pdf-outputTokens": 1789,
    "pdf-image-ocr-count": 0,
    "pdf-image-ocr-failed-count": 0,
    "pdf-image-ocr-success-count": 18,
    "pdf-image-ocr-empty-count": 4,
    "pdf-image-ocr-hadText-count": 14,
    "pdf-image-ocr-pixels": 25423757,
    "pdf-multimodal-time": 0,
    "pdf-multimodal-pdf2Image": 0,
    "pdf-high-res-ocr": 3
  },
  "raw_parameters": null,
  "debug": null
}